Proof, measured in kilometres.

Representative project profiles from the HTPS delivery record across Southern Africa. Client names withheld under confidentiality; full references available on request.

MANUFACTURED IN WADEVILLE, JOHANNESBURG

BUTT WELDING TO ISO 21307:2017

200

km+

Pipeline delivered

4

Commodities served

3

Countries active

20

Technology service life
P-137 · FLAGSHIP
137 km Tailings & Return Water System
Platinum Operation · Limpopo, RSA

The largest single hydro transport delivery in the HTPS record: approximately 137 km of combined tailings and return water pipeline, engineered, manufactured and delivered as one integrated system for a major platinum operation.

HDPE lined steel construction with SLUR-e-JOIN™ flange-to-flange jointing throughout, manufactured as 18 m spools in Wadeville and installed with full HTPS Field Services supervision covering bore alignment, stub mating and controlled bolt torquing.

The system carries the mine’s entire tailings stream to deposition and returns process water to the plant, replacing higher cost conveyance alternatives for the life of the operation.

HDPE Lined Steel

SLUR-e-JOIN™

Field Supervision

Tailings + Return Water

137

km

Lined spools

2

Standard fitting types

18

m

Nominal bore

ISO

Refurb turnaround
P-042
42 km Return Water Pipeline
Gold Operation · Free State, RSA

Return water conveyance from tailings storage back to plant for a deep level gold operation, specified in HDPE lined steel to eliminate the corrosion failures experienced on the previous unlined line.

Delivered with the standard HTPS fittings set: 5D long radius bends at 15, 30 and 45 degrees for optimised flow characteristics, plus custom laterals at the booster stations.

Return Water

5D Fittings

Corrosion Duty

42

km

Lined spools

450

mm

Standard fitting types

3

Nominal bore

5D

Refurb turnaround
P-009
Plant Slurry Circuit Package
Diamond Operation · Northern Cape, RSA

Complete lined piping package for an in-plant abrasive slurry circuit: 650 HDPE lined spools plus the full fittings set of bends, T-pieces, reducing tees and laterals, fabricated with CSP Engineering in Wadeville.

Uniform standard fittings contained cost and accelerated fabrication, with factory refurbishment now running as an ongoing maintenance plan for the circuit.

Plant Piping

Custom Fittings

Maintenance Plan

650

Lined spools

4

Standard fitting types

250

mm

Nominal bore

FAST

Refurb turnaround
P-006
Municipal Rising Main Refurbishment
Ekurhuleni Metro · Gauteng, RSA

Factory based refurbishment of a corroded sewer rising main: old lining stripped, pipes relined to specification and returned to site under the HTPS collection and delivery programme.

The maintenance plan alternative saved the metro the capital cost of full replacement while delivering new pipe performance on fast turnaround.

Sewer

Factory Refurbishment

Capital Saving

6

km

Main refurbished
 

400

mm

Nominal bore
 

100%

Pipes reused
 

WKS

Not months
 
P-137 · FLAGSHIP
137 km Tailings & Return Water System
Platinum Operation · Limpopo, RSA

The largest single hydro transport delivery in the HTPS record: approximately 137 km of combined tailings and return water pipeline, engineered, manufactured and delivered as one integrated system for a major platinum operation.

HDPE lined steel construction with SLUR-e-JOIN™ flange-to-flange jointing throughout, manufactured as 18 m spools in Wadeville and installed with full HTPS Field Services supervision covering bore alignment, stub mating and controlled bolt torquing.

The system carries the mine’s entire tailings stream to deposition and returns process water to the plant, replacing higher cost conveyance alternatives for the life of the operation.

HDPE Lined Steel

SLUR-e-JOIN™

Field Supervision

Tailings + Return Water

137

km

Lined spools

2

Standard fitting types

18

m

Nominal bore

ISO

Refurb turnaround
P-137 · FLAGSHIP
137 km Tailings & Return Water System
Platinum Operation · Limpopo, RSA

The largest single hydro transport delivery in the HTPS record: approximately 137 km of combined tailings and return water pipeline, engineered, manufactured and delivered as one integrated system for a major platinum operation.

HDPE lined steel construction with SLUR-e-JOIN™ flange-to-flange jointing throughout, manufactured as 18 m spools in Wadeville and installed with full HTPS Field Services supervision covering bore alignment, stub mating and controlled bolt torquing.

The system carries the mine’s entire tailings stream to deposition and returns process water to the plant, replacing higher cost conveyance alternatives for the life of the operation.

HDPE Lined Steel

SLUR-e-JOIN™

Field Supervision

Tailings + Return Water

137

km

Lined spools

2

Standard fitting types

18

m

Nominal bore

ISO

Refurb turnaround
P-006
Municipal Rising Main Refurbishment
Ekurhuleni Metro · Gauteng, RSA

Factory based refurbishment of a corroded sewer rising main: old lining stripped, pipes relined to specification and returned to site under the HTPS collection and delivery programme.

The maintenance plan alternative saved the metro the capital cost of full replacement while delivering new pipe performance on fast turnaround.

Sewer

Factory Refurbishment

Capital Saving

6

km

Main refurbished
 

400

mm

Nominal bore
 

100%

Pipes reused
 

WKS

Not months
 
P-009
Plant Slurry Circuit Package
Diamond Operation · Northern Cape, RSA

Complete lined piping package for an in-plant abrasive slurry circuit: 650 HDPE lined spools plus the full fittings set of bends, T-pieces, reducing tees and laterals, fabricated with CSP Engineering in Wadeville.

Uniform standard fittings contained cost and accelerated fabrication, with factory refurbishment now running as an ongoing maintenance plan for the circuit.

Plant Piping

Custom Fittings

Maintenance Plan

650

Lined spools

4

Standard fitting types

250

mm

Nominal bore

FAST

Refurb turnaround

Note: profiles P-042 to P-006 are representative examples pending final client sign-off. Figures indicative.

Your project belongs on this register.

From 6 km refurbishments to 137 km flagship systems, HTPS delivers at every scale.